Bio-rad ProteinChip Qualification and Calibration Kits Instrukcja Użytkownika Strona 14

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 35
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 13
7. The time required to complete this procedure is variable, and it may require up to several
hours as the instrument continually collects data of a specific intensity. If the calibration routine
does not complete, run the procedure again with unused spots.
8. Once the procedure is complete, open ProteinChip data manager software, select the
instrument, and select Instrument > Reinitialize Instrument.
9. The maintenance procedure is complete. Record the operator name and date in the
ProteinChip SELDI OQ form.
11
10010680A.qxp 8/17/2007 1:58 PM Page 11
Przeglądanie stron 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 34 35

Komentarze do niniejszej Instrukcji

Brak uwag