Bio-rad ChromLab™ Software Instrukcja Użytkownika Strona 119

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 118
Plumbing NGC Systems
Installation Guide | 117
To plumb the pH valve
1. Connect the pump head wash priming tubing to the Cal In port on the pH valve.
2. Connect waste tubing to the Cal Out port on the pH valve.
3. Immerse the other end in the waste container.
4. Connect Tube #2 from the 40 psi backpressure regulator that you connected in
step 2 on page 105 to the inlet port (In) on the pH valve.
5. Connect Tube #4 to the outlet port (Out) on the pH valve.
6. Connect the other end of Tube #4 to the Common port on the BioFrac fraction
collector diverter valve.
Przeglądanie stron 118
1 2 ... 114 115 116 117 118 119 120 121 122 123 124 ... 177 178

Komentarze do niniejszej Instrukcji

Brak uwag